As approved at the AGM held on 15th March 2015, the construction of a new residence for monks is presently in planning stage. The building comprises two levels and a basement covering a total floor area of approximately 8000 Sq. ft. It is estimated that the total cost of the project is $1,200,000.00 some part of which, the Society expects to procure by a Bank Loan. Toronto Mahavihara Society appeals to all its members and friends of the Society to extend their generous support in realizing this target amount. Please enter your contribution amounts and other information in the form below.

Monetary Contribution Options
Cash, Cheque, Pre-authorized Debit (PAD) and PayPal

The donations (cheques or cash) may be handed over to one of the resident monks in an envelope marked "Āvasage Donation Fund" with your name and amount written on it. All received donations will immediately be deposited in a special Bank Account opened solely for the Āvasage Donation Fund.

It will be appreciated if the pledged contributions are delivered as soon as possible. A tax receipt will be mailed to the address you enter in the "Mailing Address" Box. If you wish to make any other form of donation or for further information please contact Toronto Mahavihara.
Tel: (416) 208 9276.

                                                               Please help succeed in this worthy project.  See table at the bottom for donations made so far.
CODEITEMRATEUNITS  CODEITEMRATEUNITS
1.0 Main Items
1.1Pledge for Loan$ 5000 1.2Foundation Stones$ 250
1.3Unit Area Build$ 425 1.4Cash Donations$ 1.00
2.0 Build Items
2.1Roof Unit Build$ 150 2.2Car Park Unit Build$ 125
2.3Building Enveloping & External Finishes$ 400 2.4Rain Water Management$ 950
3.0 Supply and Install
3.1Door (Entrance Door) External$ 2500 3.2Door (Entrance Door) Internal$ 2500
3.3External Doors$ 950 3.4Internal Doors$ 525
3.5Windows with Sill (Upper Level)$ 550 3.6Windows with Sill (Lower Level)$ 775
3.7Main Washroom Complete(Ground Lvel)$ 1500 3.8Washrooms at Upper Lvel & Basement$ 1350
4.0 Finishes Supply and Install
4.1Linear Moulding$ 190 4.2Room Painting$ 2900
4.3Common Area Painting$ 25 4.4Decorations - Curtains; Blinds; etc$ 1500
5.0 Services Supply and Install
5.1HVAC System$ 500 5.2Electrical System$ 950
6.0 Equipment and Furniture Supply and Install
6.1Kitchen Equipment$ 1000 6.2Pantry Cupboards$ 550
6.3Laundry Equipment with racks/cabinets$ 1500 6.4Furniture$ 1500
7.0 Miscellaneous
7.1New Linen supply$ 1250 7.2Kitchenware Supply - Spoons etc$ 2500